Skip to content

24/7 emergency repairs across Gauteng

081 566 5451

Gate motors · Installation

Gate motor installation near me: sliding and swing gates, done properly

We install sliding and swing gate motors across Johannesburg, the East Rand and Centurion, from Centurion, ET and Gemini kits with the battery, rack and remotes in the box. Here's how the right motor is chosen, what a proper installation includes, and what it costs.

Our promise

1-year guarantee on every motor kit we supply and install

Our promise

Six-month guarantee on our repairs

A technician fitting a sliding gate motor onto a concrete plinth beside a steel gate

Choosing the right motor

Three things decide the motor, and the technician checks all three before quoting:

  1. Sliding or swing. A sliding gate takes one motor beside it; a swing gate takes a motor on each leaf.
  2. The gate's weight, and on a swing gate the length of each leaf. Every motor is built for a maximum, and a long swing leaf counts for more than its weight. The figures for each motor are on sliding gates and swing gates.
  3. How busy the gate is. A house gate that opens a dozen times a day is a different job from a complex gate that opens every few minutes, and the motor's duty cycle has to match.

The brand comes after that: Centurion, ET and Gemini all make motors for the usual driveway gate, and the choice is often about remotes you already have, a keypad or app you want, and price.

What a proper installation includes

The makers' installation manuals set out the job. Done properly, it covers:

  • The gate first. It must roll or swing freely by hand, with sound wheels, guide rollers or hinges and end stoppers, before a motor goes on it.
  • The base plate, level and above the highest water that runs down the driveway. Cast into fresh concrete, ET notes it needs more than 48 hours to cure before the motor is fitted; on a sound slab it can be fixed down instead.
  • Cabling in conduit, laid before the motor, in flexible multi-stranded cable that survives the vibration.
  • The rack or the arms, fixed so the rack sits 1 to 2 mm off the pinion along the whole gate, or so the arms meet the leaves at the angle their manual gives.
  • An earth. Centurion's surge protection only works if the motor is earthed: through the mains earth or an earth spike beside the motor, a copper rod of over a metre driven into the ground.
  • Limits and setup: the open and closed positions, the force the motor learns, auto-close, pedestrian opening and the remotes.
  • Safety beams, which ET and Centurion require before a gate may close on its own.
  • The handover: you're shown how to use the manual release and how the safety sensing works, and you get the user manual.

On Centurion's D3, D5-Evo and D6 SMART sliders, a theft-deterrent cage can be fitted over the motor to make it much harder to get at.

A technician fitting a sliding gate motor onto a concrete plinth beside a steel gate

Power at the gate

Most gate motors run from a battery that a charger keeps topped up, so the supply only has to feed the charger. Depending on the model, that supply is either mains at the motor or a low-voltage feed from a transformer plugged in at the house:

  • Mains at the motor needs a weatherproof isolator switch within 1.5 m of it, out of the gate's path and away from the street, and a certificate of compliance for the circuit. Putting in a power point or a mains circuit is a job for a registered electrician.
  • Low voltage from a plug-in transformer, as on ET's Drive 300 and Drive 500 or Centurion's D5-Evo Low-Voltage, runs a safe voltage down its own cable to the motor.

If there's no power at the gate yet, tell us on the job card and we'll say which way suits your property.

Replacing an old motor

Many installations replace a motor that has reached the end of its life, and that changes the job a little:

  • The rack may stay, if it's straight, firmly fixed and the new motor's pinion matches it. A rack that has worn, sagged or rusted through is replaced with the motor.
  • The base may need changing, because base plates differ between makes and models.
  • Remotes may carry over. A new ET Drive reads both ET BLUE and ET BLU MIX remotes, so working ET remotes can often be coded across; moving to another make means new remotes.
  • Beams, keypads and intercoms are usually reconnected to the new control card, if they still work.

The technician checks each of these on site, and the quote says what is reused and what is new. If the old motor might still be worth fixing, repair or replace a gate motor sets out what to weigh up first.

Installed kit prices

Each kit is priced installed on a gate that already runs freely. 1-year guarantee on every motor kit we supply and install. Prices checked October 2026.

  • Sliding gate kit

    Centurion D5-Evo SMART sliding gate kit

    R7 999incl. installation

    In the kit

    • D5-Evo SMART motor (gates up to 500 kg)
    • 12 V 7 Ah battery
    • 2 × 4-button NOVA remotes
    • 4 m steel rack
    Our promise

    1-year guarantee on every motor kit we supply and install

  • Sliding gate kit

    ET Drive 500 sliding gate kit

    R6 999incl. installation

    In the kit

    • Drive 500 (gates up to 500 kg)
    • 12 V 7 Ah battery
    • 4 m steel rack
    • 2 × 4-button ET remotes
    Our promise

    1-year guarantee on every motor kit we supply and install

  • Sliding gate kit

    Gemini 12 V DC slider kit

    R6 999incl. installation

    In the kit

    • Gemini DC slider (gates up to 500 kg)
    • 2 × 3-button Gemini remotes
    • 12 V 7 Ah battery
    • 4 m steel rack
    Our promise

    1-year guarantee on every motor kit we supply and install

  • Swing gate kit

    Centurion Vantage 500 double swing kit

    R15 799incl. installation

    In the kit

    • 2 operators
    • wall box with charger
    • 12 V 7 Ah battery
    • mains isolator
    Our promise

    1-year guarantee on every motor kit we supply and install

  • Swing gate kit

    ET Wingo single swing kit

    R10 999incl. installation

    In the kit

    • 1 operator
    • 2 × 4-button ET remotes
    • 12 V 7 Ah battery
    • wall box with charger
    Our promise

    1-year guarantee on every motor kit we supply and install

  • Swing gate kit

    ET Wingo double swing kit

    R13 999incl. installation

    In the kit

    • 2 operators
    • 2 × 4-button ET remotes
    • 12 V 7 Ah battery
    • wall box with charger
    Our promise

    1-year guarantee on every motor kit we supply and install

Prices checked October 2026. Price includes the kit listed, standard installation on a gate or door that already runs freely, and our 1-year kit guarantee. Not included: a power point at the motor if there isn't one (a job for a registered electrician), extra rack, gate or door repairs, and accessories. These are quoted before any work starts.

Compare two kits

SpecCenturion D5-Evo SMART sliding gate kitET Drive 500 sliding gate kit
Price, installedR7 999R6 999
ForSliding gateSliding gate
In the boxD5-Evo SMART motor (gates up to 500 kg)Drive 500 (gates up to 500 kg)
In the box12 V 7 Ah battery12 V 7 Ah battery
In the box2 × 4-button NOVA remotes4 m steel rack
In the box4 m steel rack2 × 4-button ET remotes
Guarantee1-year guarantee on every motor kit we supply and install1-year guarantee on every motor kit we supply and install

What installation typically costs in Johannesburg

If you're comparing quotes, these are typical market figures from published cost guides:

Gate motor installation, typical Johannesburg prices
JobTypical price
Automating an existing sliding gate, motor and labour togetherR6 500–R12 000 (Kandua)
Installation labour, sliding gate motorR1 500–R3 000 (Kandua)
Installation labour, swing gate motorR2 500–R4 500 (Kandua)
Safety beams supplied and fittedR750–R1 500 (Kandua)

Prices checked October 2026. What each kit costs in shops, and every kit side by side, is on gate motor prices. Your exact price is set in a free quote before any work starts. No call-out fee when we do the work. If no work is done, a R650 call-out fee applies.

After it's installed

A new motor needs little, but the gate keeps needing what it needed before: a clear track, free wheels and rollers, and a rack that doesn't drop onto the pinion. Every so often, check that the gate stops and reverses when it meets something in its way, with the beams covered, as its manual describes.

If anything changes, from a new noise to a gate that stops short, book us before it becomes a breakdown. Repairs are covered on gate motor repairs, batteries on gate motor batteries and remotes on gate remotes.

A technician aligning a safety beam on a short post beside a sliding gate

Gate motor installation near you

We install in 21 areas across Johannesburg, the East Rand and Centurion.

Questions

Gate motor installation questions

How much to install a gate motor?

With the kit, our installed sliding kits are on the cards above. For fitting alone, the cost guides put sliding gate motor installation at R1 500–R3 000 (Kandua) in Johannesburg, and swing motors higher. Prices checked October 2026. See the market prices.

How to install gate motor?

In outline: make sure the gate runs freely, set the base plate and conduit, mount the motor, fit the rack 1 to 2 mm off the pinion, earth it, connect the battery and power, then set the limits, beams and remotes and test the safety sensing. It's a job for an installer, because of the mains, the weight and the safety settings. See what an installation includes.

Do I need safety beams with a new gate motor?

ET highly recommends a pair of safety beams with every gate motor, and both ET and Centurion require them before a gate may close by itself. Without beams, the motor still senses a collision, but only once the gate has touched something. See what an installation includes.

How much does an electric gate installation cost?

To automate an existing sliding gate, motor and labour together, the cost guides give R6 500–R12 000 (Kandua) in Johannesburg; a new gate as well costs more. Our kits are priced installed, with 1-year guarantee on every motor kit we supply and install. Prices checked October 2026. See the kits.

Book a technician

Get a gate motor quote

Job card

We WhatsApp or call you back. Fields marked (required) are needed.

Property type
When
Photos (optional, up to 4)

No call-out fee when we do the work. If no work is done, a R650 call-out fee applies.